Federal Pacific panel replacement
Inglewood · 1 day
200A panel, new grounding electrode, 34 circuits relabeled and tested. Inspection passed same week.
VOLTLINE ELECTRIC
Panels · EV chargers · Rewires
A sample of jobs from the last few months, with the scope and honest timeline.
Inglewood · 1 day
200A panel, new grounding electrode, 34 circuits relabeled and tested. Inspection passed same week.
East Nashville · 9 days
1,650 sq ft bungalow rewired in three phases with the family living in place the whole time.
Nolensville · 1 day
Two 48A chargers on a load-managed subpanel with utility rebate filed on the owner's behalf.
Brentwood · 2 days
22kW standby with automatic transfer switch and prioritized load shedding for HVAC and well pump.
The Nations · 4 days
Dedicated circuits for hood, walk-in, and line equipment, coordinated with the health inspection.
Green Hills · 3 days
62 recessed cans converted to LED with dimmers that actually hold low levels without flicker.